You cannot select more than 25 topics Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.

902 B

title linkTitle weight
Task synchronization with a repository Task synchronization 20

Notice: this feature works only if a git repository was specified when the task was created.

  1. At the end of the annotation process, a task is synchronized by clicking Synchronize on the task page. If the synchronization is successful, the button will change to Sychronized in blue:

  2. The annotation is now in the repository in a temporary branch. The next step is to go to the repository and manually create a pull request to the main branch.

  3. After merging the PR, when the annotation is saved in the main branch, the button changes to Merged and is highlighted in green.

If annotation in the task does not correspond annotations in the repository, the sync button will turn red: